| 1. | The section of tai po road tai wai section westbound between shing chuen road and lion rock tunnel road ; and 介乎成全路及狮子山隧道公路之间的一段大埔公路 |
| 2. | The western kerbside lane of shing wan road from its eastern junction with shing chuen road to a point about 20 metres north of the same junction 成运路由其成全路东面交界处起,至同一交界处以北约 |
| 3. | The eastern kerbside lane of shing wan road from its eastern junction with shing chuen road to a point about 10 metres north of the same junction 成运路由其与成全路东面交界处起,至同一交界处以北约 |
| 4. | The northern kerbside lane of shing chuen road from its eastern junction with shing chuen road to a point about 15 metres east of the same junction 成全路由其与成运路东面交界处起,至同一交界处以东约 |
| 5. | The western kerbside lane of shing wan road from its eastern junction with shing chuen road to a point about 20 metres north of the same junction ; and 成运路由其成全路东面交界处起,至同一交界处以北约 |
| 6. | The eastern kerbside lane of shing wan road from its eastern junction with shing chuen road to a point about 25 metres north of the same junction ; and 成运路由其与成全路东面交界处起,至同一交界处以北约 |
| 7. | 3 in tai wai , the section of tai po road tai wai section westbound between lion rock tunnel road and shing chuen road will be temporarily closed daily from 1 : 15 a . m . to 5 : 00 a . m . between 6 and 11 november 2006 号道路建造工程,介乎狮子山隧道公路及成全路之间的一段大埔公路大围段 |